The mill dam is supposed to control the level of the pond, but that level is now well below the top of the dam. Instead, the recent breach a short distance upstream has opened wider, with a considerable volume of water now briskly flowing past the "bowed tree" I have been photographing. From there, the water passes beneath a small, wooden bridge and into the Millstone River, completely avoiding the dam. I shall keep you posted.